Pedestrian bridge solutions

Railway and station footbridges

Footbridges over tracks, where railway operator rules and possession windows drive the design and installation.

Schematic illustration: Railway and station footbridges
Schematic illustration, not a photograph of a completed project.

Bridges over railways must satisfy the rules of the rail operator in addition to the bridge design code: clearances, electrical safety, protection screens and installation during short possessions.

Points to define

  • The operator standards that apply and who approves the design.
  • Possession duration and the lifting method.
  • Inspection and maintenance access without closing the line.

Final member sizes, details and specifications are determined by the engineer of record for each project. This page describes general practice and does not replace project-specific engineering.

This content is general technical information. It does not replace project-specific structural design, which must be carried out or approved by a qualified engineer under the applicable codes and the requirements of the authority having jurisdiction.

Have drawings or a design brief?

Send your project information and drawings securely. An engineer reviews every request.

Get a quote Contact