Lösungen für Fußgängerbrücken

Tied arch pedestrian bridges

The deck ties the arch ends together, so foundations carry mainly vertical load.

Diese Seite ist noch nicht auf Deutsch verfügbar. Die englische Version wird angezeigt.

Schematische Darstellung: Tied arch pedestrian bridges
Schematische Darstellung, kein Foto eines ausgeführten Projekts.

In a tied arch the horizontal thrust of the arch is resisted by a tie, usually the deck edge girder. This makes the arch form possible on sites where foundations cannot take large horizontal forces.

Typical considerations

  • Hanger arrangement and adjustability.
  • Shallow structural depth below the deck, which helps with clearances.
  • Lifting the completed span or erecting it on temporary supports.

Final member sizes, details and specifications are determined by the engineer of record for each project. This page describes general practice and does not replace project-specific engineering.

Dieser Inhalt ist eine allgemeine technische Information. Er ersetzt keine projektspezifische Tragwerksplanung, die von einem qualifizierten Ingenieur nach den geltenden Normen und den Vorgaben der zuständigen Behörde erstellt oder geprüft werden muss.