Abutment
The end support of a bridge, which carries the superstructure and retains the approach embankment.
Bearing
A device that transfers loads from the superstructure to the substructure while allowing specified movements or rotations.
Camber
An upward curvature built into a member so that it reaches the intended profile under permanent loads.
Chord
The top or bottom longitudinal member of a truss.
Corrosivity category
A classification of the corrosiveness of an environment, for example C1 to CX in ISO 12944.
Deck
The surface of the bridge that carries pedestrians and cyclists.
Dry film thickness (DFT)
The thickness of a dried paint coating, measured to verify compliance with the specification.
Duplex system
A corrosion protection system combining hot-dip galvanizing with a paint system.
Engineer of record
The qualified engineer responsible for the structural design of the bridge.
Execution class
In EN 1090, a class (EXC1 to EXC4) that defines the set of execution requirements for a structure or component.
Fatigue
Damage caused by repeated stress cycles, which can lead to cracking at details such as welds.
Hanger
A tension member that carries the deck from an arch or main cable.
Hold point
A point in the inspection plan beyond which work may not proceed without the release of the client or inspector.
Inspection and test plan (ITP)
A document that lists inspections, tests, acceptance criteria and responsibilities for a project.
Non-destructive testing (NDT)
Testing methods that detect defects without damaging the part, such as ultrasonic or magnetic particle testing.
Parapet
The protective barrier along the edge of the deck.
Pony truss
A truss bridge without overhead bracing, where the deck runs between the trusses.
Shop drawings
Detailed fabrication drawings that define each piece, weld and hole.
Splice
A connection that joins two segments of a member, often made on site with bolts.
Tied arch
An arch whose horizontal thrust is resisted by a tie, usually the deck, instead of by the foundations.
Trial assembly
Assembly of segments in the shop to check fit and geometry before shipment.
Tuned mass damper
A device that reduces vibration by adding a mass on a spring and damper tuned to a natural frequency of the structure.
Weathering steel
Steel alloyed to form a protective oxide layer in suitable environments.
Welding procedure specification (WPS)
A written, qualified procedure that defines how a weld is made.