Soluciones de puentes peatonales

Tied arch pedestrian bridges

The deck ties the arch ends together, so foundations carry mainly vertical load.

Esta página aún no está disponible en Español. Se muestra la versión en inglés.

Ilustración esquemática: Tied arch pedestrian bridges
Ilustración esquemática, no una fotografía de un proyecto ejecutado.

In a tied arch the horizontal thrust of the arch is resisted by a tie, usually the deck edge girder. This makes the arch form possible on sites where foundations cannot take large horizontal forces.

Typical considerations

  • Hanger arrangement and adjustability.
  • Shallow structural depth below the deck, which helps with clearances.
  • Lifting the completed span or erecting it on temporary supports.

Final member sizes, details and specifications are determined by the engineer of record for each project. This page describes general practice and does not replace project-specific engineering.

Este contenido es información técnica general. No sustituye el diseño estructural específico del proyecto, que debe ser realizado o aprobado por un ingeniero calificado según las normas aplicables y los requisitos de la autoridad competente.

¿Tiene planos o un pliego técnico?

Envíe la información y los planos de su proyecto de forma segura. Un ingeniero revisa cada solicitud.

Cotizar Contacto