Esta página aún no está disponible en Español. Se muestra la versión en inglés.
Bridges over railways must satisfy the rules of the rail operator in addition to the bridge design code: clearances, electrical safety, protection screens and installation during short possessions.
Points to define
- The operator standards that apply and who approves the design.
- Possession duration and the lifting method.
- Inspection and maintenance access without closing the line.
Final member sizes, details and specifications are determined by the engineer of record for each project. This page describes general practice and does not replace project-specific engineering.
Este contenido es información técnica general. No sustituye el diseño estructural específico del proyecto, que debe ser realizado o aprobado por un ingeniero calificado según las normas aplicables y los requisitos de la autoridad competente.