حلول جسور المشاة

Steel arch pedestrian bridges

Deck or through arches for landmark crossings where appearance matters as much as span.

هذه الصفحة غير متاحة بعد باللغة العربية. يتم عرض النسخة الإنجليزية.

رسم تخطيطي: Steel arch pedestrian bridges
رسم تخطيطي، وليس صورة لمشروع منجز.

An arch carries load mainly in compression and pushes outward at its supports. True arches need foundations that can resist this thrust; where the ground cannot, a tied arch may be used instead.

Typical considerations

  • Curving tubes or plates to the arch geometry, and the tolerances achievable.
  • Hanger or spandrel connections and their fatigue details.
  • Temporary works and erection sequence until the arch is closed.

Final member sizes, details and specifications are determined by the engineer of record for each project. This page describes general practice and does not replace project-specific engineering.

هذا المحتوى معلومات فنية عامة. ولا يغني عن التصميم الإنشائي الخاص بالمشروع، والذي يجب أن ينفذه أو يعتمده مهندس مؤهل وفق الكودات المعمول بها ومتطلبات الجهة المختصة.

هل لديكم مخططات أو موجز تصميم؟

أرسلوا معلومات مشروعكم ومخططاته بأمان. يراجع مهندس كل طلب.

احصل على عرض سعر اتصل بنا