Railway and station footbridges

Footbridges over tracks, where railway operator rules and possession windows drive the design and installation.

هذه الصفحة غير متاحة بعد باللغة العربية. يتم عرض النسخة الإنجليزية.

رسم تخطيطي: Railway and station footbridges
رسم تخطيطي، وليس صورة لمشروع منجز.

Bridges over railways must satisfy the rules of the rail operator in addition to the bridge design code: clearances, electrical safety, protection screens and installation during short possessions.

Points to define

  • The operator standards that apply and who approves the design.
  • Possession duration and the lifting method.
  • Inspection and maintenance access without closing the line.

Final member sizes, details and specifications are determined by the engineer of record for each project. This page describes general practice and does not replace project-specific engineering.

هذا المحتوى معلومات فنية عامة. ولا يغني عن التصميم الإنشائي الخاص بالمشروع، والذي يجب أن ينفذه أو يعتمده مهندس مؤهل وفق الكودات المعمول بها ومتطلبات الجهة المختصة.

هل لديكم مخططات أو موجز تصميم؟

أرسلوا معلومات مشروعكم ومخططاته بأمان. يراجع مهندس كل طلب.

احصل على عرض سعر اتصل بنا