Design basis and responsibilities
Who designs what: the engineer of record, the fabricator and the connection designer.
당사는 프로젝트의 책임 기술자와 협력합니다. 구조 설계 서비스를 제공하는 경우 프로젝트 및 관할 지역별로 확인합니다.
Who designs what: the engineer of record, the fabricator and the connection designer.
Crowd loads, maintenance vehicles, wind, snow and temperature: what to confirm before design.
Light, slender footbridges can be excited by walking and running. Comfort criteria are part of the design.
Bolted and welded connections, and how splice locations affect fabrication and installation.
Selecting the steel grade, toughness and documentation required by the specification.
Seismic regions, flood exposure, vehicle impact and other special situations.
프로젝트 정보와 도면을 안전하게 보내 주세요. 모든 요청은 기술자가 검토합니다.